402 pricing benchmarks to help you evaluate your construction quote.
| Service / Item | Low | Average | High |
|---|---|---|---|
| Allowances (% of total) (percent) | $0.5 | $2 | $5 |
| Artwork / Decor Allowance (GSF) | $0.25 | $1 | $4 |
| Design Contingency (% of total) (percent) | $3 | $8 | $15 |
| Escalation (annual %) (percent) | $3 | $5 | $8 |
| Furniture, Fixtures & Equipment (FF&E) (GSF) | $5 | $20 | $50 |
| GC Contingency (% of total) (percent) | $1 | $3 | $5 |
| Geogrid at Hardscape Areas (SF) | $2 | $5 | $10 |
| IT / Telecom Infrastructure Allowance (GSF) | $2 | $5 | $12 |
| Landscaping Allowance (GSF) | $0.5 | $2 | $6 |
| Over-excavation & Stone Backfill (CY) | $20 | $45 | $80 |
| Owner Contingency (% of total) (percent) | $3 | $7 | $12 |
| Phasing / Occupied Building Premium (percent) | $5 | $12 | $20 |
| Temporary Heating & Cooling Allowance (lump sum) | $25,000 | $75,000 | $200,000 |
| Temporary Roads / Site Access (lump sum) | $5,000 | $20,000 | $60,000 |
| Utility Connection / Tap Fees (lump sum) | $5,000 | $25,000 | $100,000 |
| Winterization / Cold Weather Concrete (CY) | $10 | $25 | $50 |
| Service / Item | Low | Average | High |
|---|---|---|---|
| ACM (Aluminum Composite) Panels (SF) | $25 | $45 | $80 |
| Air Barrier / Vapor Barrier (SF) | $1 | $2.5 | $5 |
| Below-Grade Waterproofing (membrane) (SF) | $5 | $12 | $25 |
| Building Envelope (% of building) (percent) | $5 | $10 | $18 |
| Curtain Wall System (stick-built) (SF) | $40 | $75 | $130 |
| Curtain Wall System (unitized) (SF) | $60 | $100 | $175 |
| EIFS (Exterior Insulation Finish System) (SF) | $8 | $16 | $28 |
| Expansion Joint Cover (LF) | $40 | $90 | $175 |
| Fiber Cement Panel / Siding (SF) | $8 | $16 | $28 |
| Fluid-Applied Air/Vapor Barrier (SF) | $2 | $5 | $10 |
| Green / Vegetative Roof (SF) | $15 | $30 | $60 |
| Insulation - Rigid Board (SF) | $1.5 | $3 | $6 |
| Insulation - Spray Foam (SF) | $2 | $4 | $8 |
| Metal Wall Panels (SF) | $15 | $30 | $55 |
| Precast Concrete Wall Panel (SF) | $25 | $50 | $85 |
| Rainscreen Panel System (SF) | $25 | $50 | $90 |
| Roof Hatch (each) | $1,500 | $3,000 | $6,000 |
| Roof Insulation (tapered cricket system) (SF) | $3 | $6 | $12 |
| Roofing ($/GSF) (GSF) | $4 | $10 | $22 |
| Roofing - Built-Up / Modified Bitumen (SQ) | $500 | $900 | $1,500 |
| Roofing - Standing Seam Metal (SQ) | $800 | $1,400 | $2,400 |
| Roofing - TPO/PVC Membrane (SQ) | $600 | $1,100 | $1,800 |
| Sheet Metal Flashing / Trim (LF) | $8 | $20 | $40 |
| Skylight (SF) | $60 | $110 | $200 |
| Spray Fireproofing (SF) | $1.5 | $2.75 | $5 |
| Waterproofing, Caulking & Sealants (GSF) | $1 | $3 | $7 |
| Service / Item | Low | Average | High |
|---|---|---|---|
| Concrete (% of building cost) (percent) | $3 | $6 | $12 |
| Concrete (overall $/GSF) (GSF) | $10 | $22 | $45 |
| Concrete Columns (CY) | $600 | $1,100 | $1,800 |
| Concrete Curb (interior) (LF) | $15 | $30 | $55 |
| Concrete Pumping (CY) | $15 | $30 | $55 |
| Concrete Saw Cutting (LF) | $3 | $6 | $12 |
| Concrete Sealer / Hardener (SF) | $0.5 | $1.25 | $2.5 |
| Concrete Stair (cast-in-place) (flight) | $3,000 | $7,000 | $15,000 |
| Concrete Topping/Overlay (SF) | $3 | $6 | $11 |
| Concrete Walls (structural) (SF) | $15 | $30 | $55 |
| Elevated Concrete Slab (cast-in-place) (SF) | $12 | $22 | $38 |
| Elevated Concrete Slab (post-tension) (SF) | $10 | $18 | $30 |
| Fiber Reinforcement (CY) | $8 | $15 | $30 |
| Foundation Walls (CY) | $400 | $700 | $1,200 |
| Grout / Non-Shrink Grout (CF) | $15 | $35 | $65 |
| Precast Concrete Panels (SF) | $20 | $40 | $70 |
| Precast Concrete Stair (flight) | $5,000 | $12,000 | $25,000 |
| Rebar (#4 installed) (ton) | $1,200 | $1,800 | $2,800 |
| Slab on Grade (4" standard) (SF) | $4 | $7 | $12 |
| Slab on Grade (6" reinforced) (SF) | $6 | $10 | $16 |
| Spread Footings (CY) | $350 | $600 | $1,000 |
| Tilt-Up Wall Panels (SF) | $12 | $22 | $38 |
| Vapor Barrier (under slab) (SF) | $0.3 | $0.75 | $1.5 |
| Wire Mesh (welded) (SF) | $0.5 | $1 | $2 |
| Service / Item | Low | Average | High |
|---|---|---|---|
| Conduit (EMT, average) (LF) | $8 | $18 | $35 |
| EV Charging Station (Level 2) (each) | $3,000 | $7,000 | $15,000 |
| Electrical (% of building) (percent) | $8 | $14 | $22 |
| Electrical System ($/GSF, healthcare) (GSF) | $35 | $60 | $100 |
| Electrical System ($/GSF, office) (GSF) | $18 | $32 | $55 |
| Electrical System ($/GSF, warehouse) (GSF) | $6 | $14 | $28 |
| Electrical incl. Fire Alarm (healthcare) (GSF) | $40 | $65 | $110 |
| Emergency Generator (kW) | $300 | $600 | $1,200 |
| Final Electrical Usage (allowance) (month) | $2,000 | $8,000 | $20,000 |
| LED Lighting (architectural) (SF) | $6 | $12 | $25 |
| LED Lighting (standard) (SF) | $3 | $6 | $12 |
| Lightning Protection System (GSF) | $0.5 | $1.5 | $3.5 |
| Low Voltage / Data Cabling (GSF) | $2 | $5 | $12 |
| Motor Control Center (each) | $15,000 | $40,000 | $100,000 |
| Panelboard (each) | $2,000 | $5,000 | $12,000 |
| Photovoltaic Solar Array (watt) | $2 | $3 | $5 |
| Power Distribution (branch wiring) (GSF) | $5 | $10 | $20 |
| Security / Access Control (GSF) | $1 | $3 | $8 |
| Switchgear / Main Distribution (each) | $25,000 | $75,000 | $200,000 |
| Transfer Switch (automatic) (each) | $5,000 | $15,000 | $35,000 |
| Transformer (dry type) (kVA) | $30 | $60 | $120 |
| UPS (Uninterruptible Power Supply) (kVA) | $200 | $500 | $1,000 |
| Wire / Cable (average per circuit) (each) | $200 | $500 | $1,200 |
| Service / Item | Low | Average | High |
|---|---|---|---|
| Access Flooring (raised floor) (SF) | $10 | $20 | $40 |
| Acoustic Wall Panel (SF) | $10 | $22 | $45 |
| Acoustical Ceiling Tile (2x2 grid) (SF) | $4 | $7 | $12 |
| Acoustical Ceiling Tile (2x4 grid) (SF) | $3 | $5.5 | $10 |
| Ceiling (drywall, painted) (SF) | $4 | $8 | $14 |
| Ceiling (specialty / clouds / soffits) (SF) | $12 | $25 | $50 |
| Ceramic Wall Tile (standard) (SF) | $8 | $15 | $28 |
| Countertop (laminate) (LF) | $25 | $50 | $100 |
| Countertop (quartz/granite) (LF) | $65 | $130 | $250 |
| Countertop (solid surface) (LF) | $50 | $100 | $200 |
| Drywall (1 layer, taped & finished) (SF) | $2 | $3.5 | $6 |
| Drywall (2-layer fire-rated) (SF) | $3.5 | $6 | $10 |
| FRP / Wall Panels (SF) | $4 | $8 | $15 |
| Hard Flooring - Ceramic Tile (SF) | $6 | $12 | $22 |
| Hard Flooring - LVT/LVP (commercial) (SF) | $4 | $7 | $13 |
| Hard Flooring - Porcelain Tile (SF) | $8 | $15 | $28 |
| Metal Stud Framing (SF wall) | $3 | $6 | $11 |
| Metal Studs & Drywall ($/GSF) (GSF) | $8 | $18 | $38 |
| Painting ($/GSF of building) (GSF) | $2 | $4 | $9 |
| Painting (interior, commercial) (SF wall) | $1 | $2.5 | $5 |
| Polished Concrete (SF) | $3 | $7 | $14 |
| Resilient Sheet Flooring (SF) | $3 | $6 | $10 |
| Resinous / Epoxy Flooring (SF) | $5 | $12 | $25 |
| Rubber Flooring (gym/sports) (SF) | $6 | $12 | $22 |
| Shower / Tub Surround (solid surface) (each) | $1,500 | $3,500 | $7,000 |
| Soft Flooring - Broadloom Carpet (SF) | $2.5 | $5 | $9 |
| Soft Flooring - Carpet Tile (commercial) (SF) | $3 | $6 | $11 |
| Stained / Sealed Concrete (SF) | $3 | $6 | $12 |
| Stone Wall Cladding (interior) (SF) | $20 | $45 | $85 |
| Terrazzo Flooring (SF) | $15 | $30 | $55 |
| Toilet Accessories (each room) | $200 | $500 | $1,000 |
| Toilet Partitions (each) | $500 | $1,000 | $2,000 |
| Wall Base (rubber/vinyl) (LF) | $2 | $4 | $8 |
| Wall Protection (corner guards, handrails) (LF) | $15 | $35 | $70 |
| Wallcovering (vinyl, Type II) (SF) | $2 | $4 | $8 |
| Service / Item | Low | Average | High |
|---|---|---|---|
| Fire Alarm (% of building) (percent) | $1 | $2 | $3.5 |
| Fire Alarm System (GSF) | $2 | $4.5 | $9 |
| Fire Pump (each) | $25,000 | $50,000 | $90,000 |
| Fire Sprinkler (% of building) (percent) | $1 | $2 | $3.5 |
| Fire Sprinkler - Light Hazard (head) | $120 | $200 | $350 |
| Fire Sprinkler - Ordinary Hazard (head) | $150 | $250 | $400 |
| Fire Sprinkler System ($/GSF) (GSF) | $2.5 | $5.5 | $10 |
| Service / Item | Low | Average | High |
|---|---|---|---|
| Admin / Document Control (monthly) (month) | $4,000 | $6,500 | $10,000 |
| As-Built Drawings (lump sum) | $3,000 | $10,000 | $25,000 |
| Assistant Superintendent (monthly) (month) | $7,000 | $11,000 | $16,000 |
| BIM / Virtual Construction (lump sum) | $10,000 | $40,000 | $100,000 |
| Commissioning (Cx) Agent (GSF) | $0.5 | $1.5 | $3.5 |
| Dumpster & Waste Removal (monthly) (month) | $1,000 | $2,500 | $5,000 |
| Field Office Trailer (monthly) (month) | $800 | $1,500 | $2,500 |
| Final Cleaning (GSF) | $0.15 | $0.35 | $0.6 |
| General Conditions (% of total) (percent) | $4 | $6.5 | $9 |
| LEED / Green Building Certification (lump sum) | $15,000 | $50,000 | $150,000 |
| Material Hoist (monthly) (month) | $3,000 | $7,000 | $15,000 |
| Mobile Crane (daily) (day) | $1,500 | $3,500 | $7,000 |
| Preconstruction Services (lump sum) | $15,000 | $35,000 | $75,000 |
| Project Engineer (monthly) (month) | $7,500 | $10,000 | $14,000 |
| Project Manager (monthly) (month) | $12,000 | $16,000 | $22,000 |
| QA/QC Manager (monthly) (month) | $8,000 | $12,000 | $17,000 |
| Safety Manager (monthly) (month) | $6,000 | $9,000 | $13,000 |
| Scaffolding (monthly per SF face) (SF) | $1 | $3 | $6 |
| Superintendent (monthly) (month) | $10,000 | $14,000 | $19,000 |
| Survey / Layout (lump sum) | $5,000 | $15,000 | $40,000 |
| Temporary Fencing (linear foot) (LF) | $5 | $12 | $22 |
| Temporary Power & Utilities (monthly) (month) | $500 | $1,500 | $3,000 |
| Temporary Toilets (monthly) (month) | $200 | $400 | $700 |
| Testing & Inspections (3rd party) (lump sum) | $10,000 | $35,000 | $100,000 |
| Tower Crane (monthly rental) (month) | $15,000 | $35,000 | $65,000 |
| Winter Protection / Enclosures (monthly) (month) | $5,000 | $20,000 | $50,000 |
| Service / Item | Low | Average | High |
|---|---|---|---|
| AHU (Air Handling Unit) (CFM) | $4 | $8 | $15 |
| Boiler (commercial) (each) | $15,000 | $40,000 | $80,000 |
| Chiller (air-cooled) (ton) | $1,200 | $2,200 | $4,000 |
| Chiller (water-cooled) (ton) | $800 | $1,600 | $3,000 |
| Controls / BAS (Building Automation) (GSF) | $2 | $5 | $12 |
| Cooling Tower (ton) | $400 | $800 | $1,500 |
| Ductwork (lb) | $5 | $9 | $16 |
| Ductwork Insulation (SF) | $2 | $4 | $8 |
| Fume Hood (laboratory) (each) | $5,000 | $12,000 | $25,000 |
| Geothermal Loop Field (ton) | $3,000 | $5,500 | $9,000 |
| HVAC (% of building) (percent) | $10 | $16 | $25 |
| HVAC System ($/GSF, healthcare) (GSF) | $40 | $65 | $100 |
| HVAC System ($/GSF, office) (GSF) | $20 | $35 | $60 |
| HVAC System ($/GSF, warehouse) (GSF) | $5 | $12 | $25 |
| Heat Recovery Unit / ERV (CFM) | $3 | $7 | $14 |
| Humidification System (each) | $5,000 | $15,000 | $35,000 |
| Kitchen Exhaust Hood & Makeup Air (each) | $8,000 | $20,000 | $45,000 |
| RTU (Rooftop Unit, per ton) (ton) | $1,500 | $3,000 | $5,500 |
| Refrigerant Piping (LF) | $20 | $50 | $100 |
| Temporary Heating & Cooling (allowance) (month) | $5,000 | $15,000 | $30,000 |
| Test & Balance (GSF) | $0.3 | $0.75 | $1.5 |
| VAV Box (each) | $1,500 | $3,000 | $5,500 |
| VRF System (Variable Refrigerant Flow) (ton) | $2,000 | $3,500 | $6,000 |
| Service / Item | Low | Average | High |
|---|---|---|---|
| Architects & Engineers Fee (percent) | $5 | $8 | $14 |
| Associated Costs / Soft Costs (% of total) (percent) | $4 | $7 | $12 |
| Builders Risk Insurance (% of total) (percent) | $0.3 | $0.75 | $1.5 |
| Building Permit Fees (% of total) (percent) | $0.2 | $0.5 | $1.5 |
| Construction Fee / GC Profit (% of total) (percent) | $2 | $4 | $7 |
| Construction Management Fee (percent) | $3 | $5 | $8 |
| Environmental Impact Study (lump sum) | $5,000 | $25,000 | $75,000 |
| General Liability Insurance (% of total) (percent) | $0.8 | $1.25 | $2 |
| Geotechnical Investigation (lump sum) | $3,000 | $15,000 | $50,000 |
| Impact / Development Fees (lump sum) | $5,000 | $50,000 | $250,000 |
| OCIP / CCIP (Wrap-Up Insurance) (percent) | $1.5 | $3 | $5 |
| Owner/Design Contingency (% of total) (percent) | $3 | $7 | $12 |
| Performance & Payment Bond (% of total) (percent) | $0.5 | $1 | $2 |
| Plan Review Fees (lump sum) | $5,000 | $25,000 | $75,000 |
| Project Management Software (percent) | $0.1 | $0.35 | $0.75 |
| Subdefault Insurance (% of total) (percent) | $0.5 | $1.25 | $2.5 |
| Utility Relocation (lump sum) | $10,000 | $50,000 | $200,000 |
| Workers Comp (blended rate) (percent) | $3 | $8 | $15 |
| Service / Item | Low | Average | High |
|---|---|---|---|
| Concrete Finisher (hour) | $40 | $65 | $100 |
| Drywall Finisher (hour) | $35 | $55 | $85 |
| Electrician (journeyman) (hour) | $55 | $85 | $130 |
| General Labor (burdened) (hour) | $35 | $55 | $85 |
| Glazier (hour) | $45 | $75 | $120 |
| HVAC / Sheet Metal Worker (hour) | $50 | $80 | $125 |
| Insulator (mechanical) (hour) | $45 | $70 | $110 |
| Ironworker (hour) | $55 | $90 | $140 |
| Laborer (demolition) (hour) | $30 | $45 | $70 |
| Operating Engineer (crane) (hour) | $60 | $95 | $150 |
| Painter (commercial) (hour) | $35 | $55 | $85 |
| Plumber (journeyman) (hour) | $55 | $85 | $130 |
| Roofer (hour) | $35 | $55 | $90 |
| Skilled Carpenter (hour) | $45 | $70 | $110 |
| Sprinkler Fitter (hour) | $55 | $85 | $130 |
| Tile Setter (hour) | $40 | $65 | $100 |
| Welder (certified) (hour) | $55 | $85 | $135 |
| Service / Item | Low | Average | High |
|---|---|---|---|
| Total MEP ($/GSF, data center) (GSF) | $100 | $200 | $400 |
| Total MEP ($/GSF, education) (GSF) | $60 | $100 | $165 |
| Total MEP ($/GSF, healthcare) (GSF) | $100 | $170 | $280 |
| Total MEP ($/GSF, hotel) (GSF) | $45 | $80 | $140 |
| Total MEP ($/GSF, laboratory) (GSF) | $150 | $250 | $400 |
| Total MEP ($/GSF, multifamily) (GSF) | $35 | $65 | $110 |
| Total MEP ($/GSF, office) (GSF) | $55 | $85 | $135 |
| Total MEP ($/GSF, retail) (GSF) | $25 | $45 | $80 |
| Total MEP ($/GSF, warehouse) (GSF) | $12 | $25 | $50 |
| Total MEP (% of building cost) (percent) | $25 | $35 | $45 |
| Service / Item | Low | Average | High |
|---|---|---|---|
| Brick Veneer (SF) | $12 | $22 | $38 |
| CMU Wall (12" reinforced/grouted) (SF) | $15 | $25 | $42 |
| CMU Wall (8" standard) (SF) | $10 | $18 | $30 |
| Masonry ($/GSF of building) (GSF) | $1 | $4 | $10 |
| Stone Veneer (SF) | $20 | $40 | $70 |
| Service / Item | Low | Average | High |
|---|---|---|---|
| Automatic Sliding Door (entrance) (each) | $5,000 | $10,000 | $18,000 |
| Doors, Frames & Hardware ($/GSF) (GSF) | $4 | $10 | $22 |
| Glass & Glazing ($/GSF) (GSF) | $2 | $6 | $15 |
| Hollow Metal Door & Frame (each) | $600 | $1,200 | $2,200 |
| Overhead/Coiling Door (each) | $2,000 | $5,000 | $12,000 |
| Sliding Patient/Barn Door (each) | $1,500 | $3,500 | $6,000 |
| Storefront / Curtain Wall (SF) | $35 | $70 | $125 |
| Window (commercial aluminum) (SF) | $25 | $50 | $90 |
| Wood Door & Frame (each) | $400 | $800 | $1,500 |
| Service / Item | Low | Average | High |
|---|---|---|---|
| ADA Shower (complete) (each) | $2,000 | $5,000 | $10,000 |
| Backflow Preventer (each) | $1,500 | $4,000 | $9,000 |
| Domestic Water Piping (LF) | $15 | $35 | $70 |
| Drinking Fountain / Bottle Filler (each) | $1,500 | $3,500 | $6,000 |
| Floor Drain (each) | $300 | $700 | $1,500 |
| Grease Interceptor (interior) (each) | $2,000 | $5,000 | $12,000 |
| Hydronic Piping (heating) (LF) | $25 | $55 | $100 |
| Lavatory / Sink (each) | $500 | $1,200 | $2,500 |
| Medical Gas System (outlet) | $1,500 | $3,500 | $6,000 |
| Natural Gas Piping (LF) | $15 | $35 | $70 |
| Plumbing (% of building) (percent) | $4 | $8 | $15 |
| Plumbing System ($/GSF) (GSF) | $8 | $18 | $40 |
| Plumbing incl. Hydronic Piping (healthcare) (GSF) | $20 | $45 | $80 |
| Roof Drain (each) | $500 | $1,200 | $2,500 |
| Sanitary/Waste Piping (LF) | $20 | $45 | $85 |
| Water Closet (toilet) (each) | $400 | $900 | $1,800 |
| Water Heater (commercial) (each) | $3,000 | $8,000 | $20,000 |
| Service / Item | Low | Average | High |
|---|---|---|---|
| ADA Compliance Upgrades (GSF) | $5 | $15 | $35 |
| Adaptive Reuse (warehouse to office) (GSF) | $80 | $160 | $300 |
| Adaptive Reuse (warehouse to residential) (GSF) | $100 | $200 | $375 |
| Asbestos Abatement (SF) | $3 | $10 | $25 |
| Elevator Modernization (each) | $75,000 | $150,000 | $300,000 |
| Healthcare Renovation (GSF) | $150 | $300 | $500 |
| Historic Renovation / Restoration (GSF) | $200 | $400 | $700 |
| Interior Demolition (selective) (GSF) | $2 | $6 | $15 |
| Lead Paint Abatement (SF) | $5 | $12 | $28 |
| Mold Remediation (SF) | $10 | $25 | $60 |
| Restaurant Buildout (GSF) | $100 | $200 | $400 |
| Retail Buildout (GSF) | $40 | $85 | $175 |
| Roof Replacement (commercial) (SQ) | $500 | $1,000 | $1,800 |
| Seismic Retrofit (GSF) | $15 | $40 | $80 |
| Tenant Improvement - Basic (office) (GSF) | $30 | $60 | $100 |
| Tenant Improvement - High-End (office) (GSF) | $100 | $175 | $300 |
| Tenant Improvement - Mid-Range (office) (GSF) | $60 | $110 | $175 |
| Window Replacement (commercial) (each) | $800 | $2,000 | $4,500 |
| Service / Item | Low | Average | High |
|---|---|---|---|
| Aggregate Base Course (CY) | $25 | $45 | $75 |
| Asphalt Paving (heavy duty) (SY) | $14 | $22 | $40 |
| Asphalt Paving (standard lot) (SY) | $8 | $14 | $25 |
| Bollards (steel, concrete filled) (each) | $500 | $1,200 | $2,500 |
| Concrete Curb & Gutter (LF) | $15 | $30 | $55 |
| Concrete Paving / Sidewalks (SF) | $5 | $10 | $18 |
| Deep Foundations / Piles (each) | $2,000 | $5,000 | $12,000 |
| Demolition (building) (GSF) | $3 | $8 | $18 |
| Detention / Retention Pond (each) | $25,000 | $75,000 | $200,000 |
| Dewatering (monthly) (month) | $3,000 | $10,000 | $30,000 |
| Earthwork & Erosion Control (acre) | $50,000 | $150,000 | $300,000 |
| Erosion Control / SWPPP (acre) | $3,000 | $8,000 | $20,000 |
| Fencing - Chain Link (6ft) (LF) | $15 | $30 | $50 |
| Fencing - Ornamental Steel (LF) | $35 | $70 | $120 |
| Fill & Compaction (CY) | $8 | $18 | $35 |
| Geotextile Fabric (SY) | $1 | $3 | $6 |
| Grease Trap / Interceptor (each) | $3,000 | $8,000 | $20,000 |
| Landscape & Irrigation (GSF) | $1.5 | $4 | $10 |
| Mass Excavation (CY) | $5 | $12 | $25 |
| Retaining Wall (concrete) (SF face) | $25 | $55 | $100 |
| Rock Excavation (CY) | $25 | $60 | $120 |
| Sanitary Sewer (per LF pipe) (LF) | $55 | $145 | $300 |
| Site Concrete (curbs, aprons) (SF) | $8 | $16 | $28 |
| Site Lighting / Poles (each) | $3,000 | $6,000 | $12,000 |
| Sitework (% of total) (percent) | $3 | $7 | $15 |
| Soil Remediation / Environmental (CY) | $50 | $150 | $400 |
| Soil Stabilization / Lime Treatment (SY) | $3 | $8 | $16 |
| Storm Utilities (per LF pipe) (LF) | $60 | $150 | $300 |
| Striping / Pavement Markings (LF) | $0.5 | $1.5 | $3 |
| Tree Removal / Clearing (per acre) (acre) | $2,000 | $6,000 | $15,000 |
| Underground Detention System (CY storage) | $40 | $80 | $150 |
| Water Utilities (per LF pipe) (LF) | $50 | $130 | $275 |
| Service / Item | Low | Average | High |
|---|---|---|---|
| Commercial Kitchen Equipment (GSF) | $15 | $40 | $80 |
| Conveying / Material Handling (GSF) | $0.5 | $3 | $8 |
| Corner Guards (stainless) (each) | $40 | $80 | $150 |
| Elevator - Hydraulic (2 stop) (each) | $60,000 | $90,000 | $140,000 |
| Elevator - Traction (multi-stop) (each) | $120,000 | $200,000 | $350,000 |
| Exterior Signage (illuminated) (each) | $5,000 | $20,000 | $60,000 |
| Fire Extinguisher Cabinet (each) | $200 | $400 | $800 |
| Flag Pole (each) | $2,000 | $5,000 | $12,000 |
| Furnishings (Window Treatments) (SF window) | $8 | $18 | $40 |
| Furnishings (general) (GSF) | $0.5 | $2 | $6 |
| Interior Signage / Wayfinding (GSF) | $0.5 | $2 | $5 |
| Laundry Equipment (commercial) (each) | $5,000 | $15,000 | $35,000 |
| Loading Dock Equipment (leveler + shelter) (each) | $8,000 | $18,000 | $35,000 |
| Medical Equipment (OFCI allowance) (GSF) | $5 | $20 | $60 |
| Operable Partition / Folding Wall (SF) | $40 | $80 | $150 |
| Projection Screen / AV System (per room) (each) | $5,000 | $15,000 | $40,000 |
| Specialties (signage, accessories, misc) (GSF) | $1 | $3.5 | $8 |
| Trash / Linen Chute (floor) | $5,000 | $10,000 | $20,000 |
| Service / Item | Low | Average | High |
|---|---|---|---|
| Embed Plates (each) | $50 | $150 | $350 |
| Light Gauge Steel Framing (SF wall) | $5 | $9 | $16 |
| Metal Decking (SF) | $3 | $5.5 | $9 |
| Miscellaneous Metals (stairs, rails, embeds) (GSF) | $1 | $3 | $7 |
| Shear Stud Connectors (each) | $2 | $5 | $10 |
| Steel Handrail / Guardrail (LF) | $50 | $120 | $250 |
| Steel Joists (ton) | $2,500 | $4,000 | $6,500 |
| Steel Lintels (LF) | $15 | $35 | $70 |
| Steel Stair (fabricated & installed) (flight) | $5,000 | $12,000 | $25,000 |
| Structural Steel ($/GSF) (GSF) | $8 | $18 | $40 |
| Structural Steel (% of building) (percent) | $4 | $8 | $15 |
| Structural Steel (fabricated & erected) (ton) | $3,500 | $5,500 | $8,500 |
| Structural Steel Connections (moment frame) (each) | $500 | $1,500 | $3,500 |
| Structural Steel Painting / Coating (SF) | $2 | $5 | $10 |
| Service / Item | Low | Average | High |
|---|---|---|---|
| AV System (conference room) (each) | $5,000 | $20,000 | $50,000 |
| Access Control (per door) (each) | $1,500 | $3,000 | $6,000 |
| CCTV / Surveillance (per camera) (each) | $1,500 | $3,500 | $7,000 |
| DAS (Distributed Antenna System) (GSF) | $1 | $3 | $7 |
| Nurse Call System (healthcare) (bed) | $2,000 | $5,000 | $10,000 |
| Paging / Intercom System (GSF) | $0.5 | $1.5 | $3.5 |
| Structured Cabling (per drop) (each) | $150 | $300 | $550 |
| Technology Systems ($/GSF total) (GSF) | $3 | $8 | $20 |
| Wireless Access Point (installed) (each) | $500 | $1,200 | $2,500 |
| Service / Item | Low | Average | High |
|---|---|---|---|
| Car Wash (express/tunnel) (GSF) | $200 | $350 | $550 |
| Church / Worship (GSF) | $150 | $250 | $400 |
| Convention Center (GSF) | $250 | $400 | $600 |
| Correctional / Detention Facility (GSF) | $275 | $425 | $650 |
| Courthouse / Government (GSF) | $300 | $450 | $650 |
| Data Center (Shell & Core) (GSF) | $250 | $400 | $650 |
| Dental Office (GSF) | $200 | $325 | $500 |
| Dialysis Center (GSF) | $275 | $425 | $625 |
| Distribution Center (GSF) | $65 | $110 | $175 |
| Fire Station (GSF) | $300 | $450 | $650 |
| Fitness / Recreation Center (GSF) | $175 | $275 | $425 |
| Gas Station / Convenience Store (GSF) | $175 | $300 | $475 |
| Higher Education / University (GSF) | $275 | $425 | $600 |
| Hospital (per bed) (each) | $1,200,000 | $2,000,000 | $3,200,000 |
| Hospital / Acute Care (GSF) | $400 | $575 | $800 |
| Hotel (Full Service/Luxury) (GSF) | $300 | $475 | $700 |
| Hotel (Select Service) (GSF) | $175 | $275 | $400 |
| Hotel (per key, full service) (each) | $175,000 | $300,000 | $500,000 |
| Hotel (per key, select service) (each) | $80,000 | $130,000 | $200,000 |
| Industrial / Warehouse (GSF) | $75 | $135 | $225 |
| K-12 School (GSF) | $200 | $325 | $475 |
| K-12 School (per student) (each) | $30,000 | $50,000 | $80,000 |
| Laboratory / R&D Facility (GSF) | $350 | $550 | $800 |
| Library (GSF) | $275 | $425 | $600 |
| Medical Office Building (GSF) | $250 | $375 | $550 |
| Mixed-Use (retail + residential) (GSF) | $175 | $300 | $475 |
| Multifamily (per unit, garden style) (each) | $120,000 | $185,000 | $275,000 |
| Multifamily (per unit, high-rise) (each) | $275,000 | $425,000 | $650,000 |
| Multifamily (per unit, mid-rise) (each) | $175,000 | $280,000 | $425,000 |
| Multifamily Residential (Concrete/Steel) (GSF) | $225 | $350 | $500 |
| Multifamily Residential (Wood Frame) (GSF) | $150 | $225 | $350 |
| Office Building (Class A) (GSF) | $200 | $300 | $450 |
| Office Building (Class B) (GSF) | $150 | $225 | $325 |
| Outpatient / Ambulatory Surgery Center (GSF) | $300 | $450 | $650 |
| Parking Garage (Above Grade) (GSF) | $50 | $80 | $125 |
| Parking Garage (Below Grade) (GSF) | $80 | $130 | $200 |
| Performing Arts / Theater (GSF) | $350 | $550 | $850 |
| Pre-Engineered Metal Building (GSF) | $25 | $50 | $90 |
| Rehabilitation / Behavioral Health Facility (GSF) | $350 | $500 | $700 |
| Restaurant (GSF) | $250 | $400 | $600 |
| Retail / Shopping Center (GSF) | $100 | $185 | $300 |
| Self-Storage Facility (GSF) | $35 | $60 | $100 |
| Senior Living (per unit) (each) | $150,000 | $250,000 | $400,000 |
| Senior Living / Assisted Living (GSF) | $200 | $325 | $475 |
| Single Family Home (custom, 2500 SF) (GSF) | $150 | $250 | $450 |
| Single Family Home (luxury) (GSF) | $300 | $500 | $900 |
| Single Family Home (production) (GSF) | $100 | $160 | $250 |
| Urgent Care / Walk-In Clinic (GSF) | $250 | $400 | $600 |
| Veterinary Clinic (GSF) | $225 | $375 | $575 |
| Service / Item | Low | Average | High |
|---|---|---|---|
| Casework & Cabinets (medical) (LF) | $350 | $650 | $1,200 |
| Casework & Cabinets (standard) (LF) | $200 | $400 | $750 |
| Millwork (general) (GSF) | $0.5 | $2 | $6 |
| Millwork (healthcare/high-end) (GSF) | $3 | $8 | $18 |
| Rough Carpentry (GSF) | $1 | $3 | $7 |
| Wood Framing (light commercial) (SF floor) | $6 | $12 | $22 |
Upload it for instant AI analysis. We'll compare every line item against these benchmarks.
Analyze Your Quote Free →