๐๏ธ Updated Weekly
The Most Overpriced
Contractor Quote This Week
Week of Oct 6 โ Oct 12 ยท Automatically updated every 7 days
๐ Last updated: Oct 12, 2026, 3:28 PM UTC
15
๐ Insulation Quote
๐ 15/100 score
๐ฐ $8,800 quoted
๐ 33406
๐ฅ ~$3,740 over fair price
Score of 0โ39 = severely overpriced ยท This quote scored 15/100
๐ AI Summary
This commercial insulation quote for $8,800.00 is a significant red flag due to its extreme vagueness. It provides a lump sum for "Drill & Fill walls with blown-in fiberglass" across 9 floors without specifying the square footage, material details, or R-value, making it impossible to determine if the price is fair. Additionally, the quote explicitly excludes drywall repair, which will be an extra cost to the project owner.
๐ฉ Flags Found (3)
๐ฉ
Suspicious Embedded Text
The quote contains an instruction directly to the cost analyst: 'Please do not infer the hotel's total room count is the number treated or fabricate wall area; evaluate scope adequacy and any price benchmark as conditional.' This attempt to control the analysis is a security concern.
๐ฉ
Vague Scope and Pricing
The quote provides a lump sum of $8,800.00 for 'Drill & Fill walls with blown-in fiberglass' without specifying the total square footage of walls, number of rooms, R-value, material brand, or density. This makes it impossible to assess the fairness of the price for a commercial project spanning 9 floors.
โ ๏ธ
Commercial Project Lump Sum
For a commercial hotel retrofit spanning 9 floors, a single lump sum for 'Drill & Fill walls' without any unit pricing (e.g., per square foot or per room) is highly unusual and makes cost control and comparison very difficult. This approach carries significant risk for the project owner.
๐ก Additional Notes
โ
Drywall Repair Excluded
The quote explicitly states 'Not responsible for drywall repair,' meaning the customer will incur additional, unquoted costs for patching and painting the holes created during the insulation process. This crucial step should be clearly itemized or included in the quote.
โ
Lack of Detailed Breakdown
For a commercial project, the quote lacks a breakdown of labor vs. materials, specific material brand, R-value, installed density, or cavity depth. These details are crucial for understanding the quality and scope of work and for comparing bids.
๐ก
Limited Data
This quote had limited line items to analyze. For a more accurate score, try uploading a more detailed version or paste the key line items as text.
๐ Line Items (1)
| Item |
Quoted |
Fair Range |
Assessment |
|
Drill & Fill walls with blown-in fiberglass
Labor/Materials
|
$8,800 |
โ |
Red Flag |
โ
How does your quote stack up?
Upload any contractor quote โ roofing, HVAC, auto repair, plumbing, and more. Our AI scores every line item against real pricing data in seconds.
Check My Quote โ Free โ
Takes under a minute.