Real quote, anonymized

Is $87,085 a fair price for plastering?

ConstructionScored 2026-07-1411 priced lines
55out of 100
Quick answer

This real construction quote totaled $87,085 and scored 55 out of 100 on QuoteScore, which reads as a little high: 4 of its 11 priced line items came in above the normal market range. The largest line was Plastering at $13,089, against a fair range of $8,483 to $18,852. For comparison, across the 125 construction quotes QuoteScore has scored, the average is 57.1 out of 100 and 36% scored under 50. A score is a pricing benchmark, not proof of overcharging.

The quote, line by line

Line itemQuoted
Demolition & Prep
Fair range $3,660 to $12,760 Fair
$9,439
Framing
Fair range $8,400 to $16,800 Good
$11,348
Plumbing
Fair range $5,000 to $12,000 High
$11,248
Electrical
Fair range $8,400 to $21,000 Good
$12,528
HVAC
Fair range $3,000 to $8,000 Good
$5,181
Plastering
Fair range $8,483 to $18,852 Good
$13,089
Trim & Carpentry
Fair range $2,650 to $7,550 High
$9,482
Stair Rebuild
Fair range $3,000 to $7,000 Good
$6,330
Painting
Fair range $3,142 to $9,426 Red flag
$1,993
Permits & Fees
Fair range $500 to $2,000 Red flag
$2,520
Flooring
Fair range $1,680 to $5,040 Good
$3,927

Quoted prices are what the shop or contractor wrote. Fair range is the regional benchmark QuoteScore compared each line against. Total quoted: $87,085. Names, companies and addresses are never shown.

How to read this

A QuoteScore of 70 or higher means the quote sits inside the normal market range for the work and region. Under 50 means at least one line was priced above that range. Higher quotes can be legitimate: better parts, a longer warranty, a harder job. The useful move is to ask about the specific lines marked High or Red flag, not to argue the total.

Construction is one of the 31 categories in the public QuoteScore dataset, currently 125 quotes with an average score of 57.1.

More real construction quotes

$14,717 for ConcreteScored 55/100 in GA$63,786 for Basement Addition (1110 sqft)Scored 55/100 in ID$76,648 for Framing/Fire Blocking/Insulation - Frame Walls According to Proposed Layout (2x4), Install Fire Blocking According to ToScored 78/100 in NJ$84,693 for Windows Material and Installation (Double Hung)Scored 40/100$3,567 for New kitchen door materials (slab only)Scored 35/100$3,100 for Subfloor Repair & Mold RemediationScored 20/100

Holding a quote of your own?

Upload a photo or PDF and get the same line by line check in about a minute. Free, no account.

Check my quote free